Company Description

Strategically located at Mahakam River, Samarinda - East Kalimantan GAPALLAN - Galangan Kapal Lancar exist and ready to be “your trusted shipyard“ partner in ship repairing & ship building in East Kalimantan Area. With the airbag ship docking system (w: 64 M, L: 125 M, 2° angle) in the total area of 54,000 M2 at the shipyard industrial estate Pulau Atas, our shipyard can accommodate 6 of 400ft barges.

For the quick handling of the ship repairs and ship buildings, our workshop is equipped with several equipment:

1.Forklift toyota 3.5 ton & 5.0 ton, Dozer, Excavator Komatsu pc200 & long arm Caterpillar
2.Welding, cutting, drilling machines
3.Launching airbags D: 1.8 m x EL: 18 m = 25 pcs (ABS Certified) & 400 MPA Compressor
4.Generator set 250 KVA & 200 KVA
5.PLN 2 x 198 KVA
6.Overhead Crane 2 x 10MT & 2 x 2,5MT and Crawler Crane 55 MT

Data Umum

HEAD OFFICE & SHIPYARD
Jl. Olah Bebaya RT03, Kawasan Industri Pulau Atas, Samarinda- East Kalimantan
Phone : +62 541 4116754, 416755
Fax : -
E-mail : marketing@gapallan.com ; sales@gapallan.com
Website: www.gapallan.com

Main Facilities


Facilities under construction

MAIN FACILITIES 

 Facilities  Capacity (DWT)  Dimension M Crane  (TLC)
 Floating Dock 1  6.000   122,5 x 63  10
 Floating Dock 2  2.000    58 x 30  -
 Slipway 1  6.000  236,5 x 63  -
 Slipway 2  2.000  330,5 x 30  -
SHIP BUILDING EXPERIENCE

SHIP REPAIR EXPERIENCE

Dock Space Available Date 2020

FLOATING DOCK 1,  6.000 DWT
Dimension 122,5 x 63 meter, Mobile Crane 10 TLC

 Month  Week I  Week 2  Week 3  Week 4  Week 5
 Oct 2021
 Nov 2021
 Dec 2021
 Jan 2022
 Feb 2022
 Mar 2022
 Apr 2022
 May 2022
 Jun 2022
 Jul 2022
 Aug 2022
 Sept 2022

Keterangan: Ο  Available  Ο Not- Available

 

FLOATING DOCK 2,  6.000 DWT
Dimension 58 x 30 meter

 Month  Week I  Week 2  Week 3  Week 4  Week 5
 Oct 2021
 Nov 2021
 Dec 2021
 Jan 2022
 Feb 2022
 Mar 2022
 Apr 2022
 May 2022
 Jun 2022
 Jul 2022
 Aug 2022
 Sept 2022

Keterangan: Ο  Available  Ο Not- Available

 

SLIPWAY 1, 6.000 DWT
Dimension 236,5 x 63 M,

 Month  Week I  Week 2  Week 3  Week 4  Week 5
 Oct 2021
 Nov 2021
 Dec 2021
 Jan 2022
 Feb 2022
 Mar 2022
 Apr 2022
 May 2022
 Jun 2022
 Jul 2022
 Aug 2022
 Sept 2022

Keterangan: Ο  Available  Ο Not- Available

 

SLIPWAY 2, 2.000 DWT
Dimension 236,5 x 63 M,

 Month  Week I  Week 2  Week 3  Week 4  Week 5
 Oct 2021
 Nov 2021
 Dec 2021
 Jan 2022
 Feb 2022
 Mar 2022
 Apr 2022
 May 2022
 Jun 2022
 Jul 2022
 Aug 2022
 Sept 2022

Keterangan: Ο  Available  Ο Not- Available

 

 

New Building Space

SLIPWAY 1,  6.000 DWT
Dimension 236,5 x 63 M,

Month  2021 2022  2023  2024 2025
 Jan
 Feb
 Mar
 Apr
 May 
 Jun
 Jul
 Aug
 Sep
 Oct
 Nov
Dec

Keterangan: Ο Available Ο Not- Available 

 

BUILDING BERTH 2,  36.000 DWT
Dimension 500 x 300 M, crane 12 TLC

Month  2021 2022  2023  2024 2025
 Jan
 Feb
 Mar
 Apr
 May 
 Jun
 Jul
 Aug
 Sep
 Oct
 Nov
Dec

Keterangan: Ο Available  Ο Not- Available 